Green Meter Price In Pakistan | Step For Installation Green Meter

green-meter-price

As more people in Pakistan shift to solar energy, the demand for green meters is increasing. These meters track both electricity consumption and solar power production. The price of a Green Meter in Pakistan typically ranges between PKR 39,000 to PKR 41,000. The installation process generally takes around 4 to 8 weeks, including approval and setup time.

Total cost of Installing Net Metering Connection 2025

Expense DescriptionExpected cost (PKR)
Sanction load approval  (Single Phase to Three phase )30000
Document File from AEDB (Alternative Energy Development Board )Certified35000
Green Meter40000
Three phase cable10000
Additional costs35000
Total Cost150,000 Approximately

Net metering allows solar energy users to sell excess electricity back to the national grid, promoting energy efficiency and financial savings. In Pakistan, this system has become increasingly popular as more households and businesses turn to renewable energy solutions.

Green Meter User Manual In PDF

Types of Solar Systems

On-grid Systems

These systems are connected to the national grid and are ideal for areas with stable grid electricity.

Off-grid Systems

Suitable for remote areas, these systems are not connected to the grid and typically use battery storage.

Hybrid Systems

Combining both on-grid and off-grid capabilities, hybrid systems provide flexibility and reliability.

green-meter-price

Installation Process and Time Duration

Installing a green meter in Pakistan involves a few steps and usually takes 30 to 60 days after applying. Here’s how it goes:

  1. Solar System Setup – First, you must install a solar system (minimum 3 kW).
  2. Net Metering Application – Apply to your local electricity company (LESCO, MEPCO, KE, etc.).
  3. System Inspection – Your system will be inspected for compliance.
  4. NOC Approval – You’ll get a No Objection Certificate from the relevant authority.
  5. Meter Installation – Once approved, your standard meter will be replaced with a green meter.

Benefits of a Green Meter

  • Cuts down electricity bills by giving credit for extra energy sent to the grid.
  • Supports clean and green energy.
  • Promotes energy independence.
  • Long-term investment that gives returns for years.
  • Helps reduce the national energy burden.

Green Meter Installation Timeline (2025)

  • Solar System Installation – Complete in 3 to 5 days
  • Net Metering Application Submission – Takes 1 to 3 days
  • Inspection by DISCO (e.g., LESCO, MEPCO) – Done in 1 to 2 weeks
  • Approval from NEPRA or Concerned DISCO – Takes 2 to 3 weeks
  • Green Meter Installation – Done within 3 to 5 days after approval
  • Total Estimated Time – Around 4 to 8 weeks (Approx. 1 to 2 months)

Conclusion

Installing a green meter in Pakistan is a smart choice if you’re using solar panels. Just keep in mind that the process takes around 1 to 2 months, so plan ahead. As more people adopt solar energy, green meters are becoming an essential tool for modern, energy-efficient homes.